Structural Foundations
Concrete Strategies’ structural concrete self-perform abilities range from simple shallow spread footing foundation systems to high-rise post-tension concrete towers. In addition, Concrete Strategies has completed parking structures 5 levels below grade to 6 levels above grade, and post tension superstructures, containing 234 to 1,100 parking spaces. Working with owners and general contractors, we’re consistently successful in maximizing vehicle accessibility while maintaining safe and attractive environments for our clients.
Projects
-

Wheeled Vehicle Drive Course
Concrete Strategies installed foundation and flatwork for 3 general instructional buildings and 1 covered mess hall on this army base in Fort Leonard Wood, MO.
-

Danforth University Center at Washington University
Concrete Strategies performed the structural concrete and flatwork for this for this new 116,000-square-foot Danforth University Center at Washington University.
-

Preston M. Green Hall at Washington University
Concrete Strategies performed the structural concrete and flatwork for this new 70,000-square-foot research facility at Washington University in St. Louis, MO.
-

Central Underground Garage at Washington University
Concrete Strategies performed the structural concrete for this 220,000-square-foot underground parking garage at Washington University in St. Louis, MO.
-

Umrath House at Washington University
Concrete Strategies performed the structural concrete and flatwork packages for the new Umrath House on Washington University’s campus in St. Louis, MO.
-

Villa Lighting
Concrete Strategies performed the tilt-up and foundations packages for this 222,573-square-foot office/warehouse for Villa Lighting in St. Louis, MO.
-

US Federal Courthouse Parking Lot
Concrete Strategies performed all site work, foundations and flatwork for the US Federal Courthouse Parking Lot in Jefferson City, MO.
-

University of Missouri – Orthopedic Institute
Concrete Strategies performed the structural concrete for this five-story orthopedic center for the University of Missouri in Columbia, MO.
-

St. Louis County Health Campus
Concrete Strategies performed the tilt-up, foundations and steel erection for the new 93,000-square-foot, 2-story clinic facility for St. Louis County Health Campus.
-

SIUE Science Building
Concrete Strategies performed the precast erection of the SIUE Science Building in Edwardsville, IL.
-

Shell Chemical LP Admin Building
Concrete Strategies performed the foundations and flatwork package for the Shell Chemical LP Admin Building in Geismar, LA.
-

Scottrade Garage
Concrete strategies performed the precast concrete for this two-level parking garage for at the Scottrade Maryville Campus in Chesterfield, MO.
-

River City Casino
Concrete Strategies provided the foundations for this 270,000-square-foot facility with the 90,000-square-foot River City Casino in Lemay, MO.
-

Prime Power
Concrete Strategies performed all concrete foundations, flatwork and site work for this new 70,000-square-foot Prime Power School Building in Fort Leonard Wood, MO.
-

Pioneer Seed
Concrete Strategies performed the foundations and flatwork for Pioneer Seed in New Madrid, MO.
-

Novus Corporate HQ
Concrete Strategies performed the foundations and flatwork packages for this 48,000-square-foot addition to this corporate office and research facility.
-

Nestle A7
Concrete Strategies performed the foundations, flatwork, and precast erection on this 7-story steel frame building for Nestle A7 in St. Louis, MO.
-

MU Power Plant
Concrete Strategies installed a temporary coal conveying system to maintain continuous plant operation during construction.
-

Fort Zumwalt West High School Addition
Concrete Strategies perform the structural foundations for this three-story classroom addition at Fort Zumwalt West High School in St. Peters, MO.
-

Fort Leonard Wood Barracks & Training Facility
Concrete Strategies performed all concrete foundations and flatwork on the five buildings of the new barracks complex in Fort Leonard Wood, MO.
-

Fish Tanks at Bass Pro
Concrete Strategies performed the foundation and flatwork for the Area C Wildlife exhibit at Bass Pro’s flagship store in Springfield, MO.
-

Dollar General Distribution Facility
Concrete Strategies perform the foundations for this 1 million-square-foot distribution facility for Dollar General in Bessemer, AL.
-

Chevron – Preservation & Maintenance Facility
Concrete Strategies performed the structural concrete and foundations for this 150,000-square-foot pre-engineered metal building for Chevron in Gray, LA.
-

Chevron – Gulf of Mexico Headquarters
Concrete Strategies performed the foundations, flatwork, elevated decks and tilt-up panels for this 300,000-square-foot corporate facility for Chevron.
-

Chaifetz Arena at St. Louis University
Concrete Strategies performed the structural concrete and flatwork for this $81 million athletic complex at Saint Louis University’s midtown campus.
-

Centene Plaza
Concrete Strategies performed the entire structural concrete package for the 17-story office tower and parking garage for Centene in Clayton, MO.
-

Caterpillar Pacific Northwest
Concrete Strategies constructed the tilt-up panels, foundations, flatwork and site utilities for this 550,000-square-foot distribution facility in Spokane, WA.
-

Caterpillar Hydraulic Excavation Plant
Concrete Strategies constructed the tilt-up panels, foundations, flatwork and site utilities for this 900,000 SF manufacturing plant for Caterpillar in Victoria, TX.
-

Casino Queen
Concrete Strategies constructed the tilt-up panels, foundations, basin slab and site concrete for the new 236,000-square-foot Casino Queen in East St. Louis, MO.
-

Boone County Hospital
Concrete Strategies performed the structural concrete and foundation for the 7-story high-rise concrete hospital patient tower in Columbia, MO.
-

Missouri Baptist Medical Center West Pavilion
Concrete Strategies performed the structural concrete and flatwork for this new 225,000-square-foot Patient Tower for Missouri Baptist Medical Center in Town & Country, MO.
-

Missouri Baptist Medical Center Parking Garage
Concrete Strategies performed the precast erection and civil concrete for this new 160,000-sqaure-foot parking garage for Missouri Baptist Medical Center in Town & Country, MO.
-

BJC Siteman Cancer Center
Concrete Strategies performed the structural concrete and flatwork for this 5,425-square-foot expansion for BJC Siteman Cancer Center in St. Louis, MO.
-

Snow Way Garage at Washington University
Concrete Strategies performed the structural concrete for this new 300-space parking structure at Washington University in St. Louis, MO.
-

Edward A. Doisy Research Center & Cloister Walk at Saint Louis University
Concrete Strategies performed the tilt-up concrete for the Cloister Walk and the structural concrete for the 10-story research center on the Saint Louis University medical campus.
-

BioMed 21
Concrete Strategies performed the structural concrete and flatwork for this bio-medical research building in St. Louis, MO.
-

Amtrak
Concrete Strategies formed and poured brand new platforms at all five stations simultaneously.