Project Details

MU Power Plant

Columbia, Missouri

  • Concrete Strategies installed a temporary coal conveying system to maintain continuous plant operation during construction.
  • Demolition of the existing coal conveying system, structural steel demolition, concrete removal, and building demolition were also completed
  • Concrete Strategies then installed foundations, slabs, structural steel, underground utilities, and grounding grids while insuring no plant interruptions
  • CSI placed and finished 4,434 cubic yards of concrete, fabricated and erected over 720 tons of steel and fabricated and installed over 200 tons of reinforcing steel.