nivo slider image nivo slider image nivo slider image nivo slider image nivo slider image nivo slider image

Project Details

Fish Tanks at Bass Pro

Springfield, Missouri

  • Concrete Strategies performed the foundation and flatwork for the Area C Wildlife exhibit at Bass Pro’s flagship store.
  • CSI installed the foundation base and walls for new stingray tank.
  • Performed deep foundations and flatwork for the Area D Connector Pit with foundation walls that ranged in height from 15’ to 24’ tall and 18” thick