nivo slider image nivo slider image nivo slider image nivo slider image nivo slider image nivo slider image

Project Details

Chevron – Preservation & Maintenance Facility

Gray, Louisiana

  • Concrete Strategies performed the structural concrete and foundations for this 150,000-square-foot pre-engineered metal building.
  • This 30-acre site development included over 12.5 acres of heavy-duty concrete paving and surface level parking lot.