Project Details
Caterpillar Pacific Northwest
Spokane, Washington
- Concrete Strategies constructed the tilt-up panels, foundations, flatwork and site utilities for this 550,000-square-foot distribution facility
- Installation of an under-slab drainage system was necessary due to the high levels of groundwater in the northwest.
- In addition to the storage and assembly area, there is a 300,000-square-foot extension space to house the largest parts.
- 4-month shell construction schedule which featured 30’ clear-height